Steel structures for industry – Argo Đole, Jagodina, Serbia

Design of steel structures, including structural calculations. Fabrication, supply, and installation of a complete feed production facility. A total of 350,000 kg of steel structures was supplied and installed.
Chemical and fertilizer industry – Galenika-Fitofarmacija, Zemun, Serbia

Engineering, supply and installation of mechanical-technological equipment for the GR, WP1 and WP2 production lines, designed and executed in accordance with modern industrial standards and the requirements of the chemical industry.