We are proud of our successfully completed projects

O&M Inženjering Group is a leading regional company in the design, manufacturing, installation, commissioning, and maintenance of process equipment.

Completed

The factory is designed with three pet food production lines, with a total capacity of 30 tonnes per hour.

Completed

The factory is designed with two pet food production lines, with a capacity of 24 tonnes per hour.

Completed

The factory is designed with two pet food production lines, each with a capacity of 10 tonnes per hour.

Completed

The factory is designed with three pet food production lines, with a total capacity of 30 tonnes per hour.

Completed

A turnkey project — the factory is designed with two pet food production lines, with a capacity of 10 tonnes per hour.

Completed

The factory is designed with two pet food production lines, with a capacity of 10 tonnes per hour.

Completed

The factory is designed for the production of animal feed with a capacity of 30 tonnes per hour.

Completed

The factory is designed for the production of animal feed with a capacity of 30 tonnes per hour.

A premix and additives production facility with a capacity of 5 tonnes per hour.

Completed

The factory is designed for efficient production of high-quality, heat-treated and pelleted animal feed, with a capacity of 10 tonnes per hour.

Completed

The factory is designed for efficient production of high-quality, heat-treated and pelleted animal feed, with two production lines, each with a capacity of 15 tonnes per hour.

Completed

The factory is designed for the production of pelleted animal feed with a capacity of 30–40 tonnes per hour.

Completed

The factory is designed for efficient production of high-quality, heat-treated and pelleted animal feed, including a vitamin and mineral premix production facility, with two production lines, each with a capacity of 15 tonnes per hour.

Completed

The factory is designed for efficient production of high-quality animal feed, with a capacity of 20 tonnes per hour.

Completed

The factory is designed for the production of animal feed, with a capacity of 5 tonnes per hour.

Completed

The factory is designed for the production of animal feed with a capacity of 20 tonnes per hour.

A premix and additives production facility with a capacity of 5 tonnes per hour.

Completed

The factory is designed for the production of pelleted animal feed with a capacity of 30 tonnes per hour.

Completed

The factory is designed for the production of animal feed with a capacity of 25–30 tonnes per hour.

A premix and additives production facility with a capacity of 2 tonnes per hour.

Completed

The factory is designed for the production of animal feed, with a capacity of 20–25 tonnes per hour.

Completed

The factory is designed for the production of animal feed with a capacity of 20–25 tonnes per hour.

Completed

The factory is designed for the production of pelleted animal feed with a capacity of 20–25 tonnes per hour.

Completed

The factory is designed for the production of pelleted animal feed with a capacity of 25 tonnes per hour.

Completed

Fabrication and installation of 21 raw material silos, each with a capacity of 120 m³, and 64 finished product silos, each with a capacity of 50 m³.

Completed

Fabrication and installation of 28 raw material silos, including 4 silos with a capacity of 260 m³ each, 20 silos with a capacity of 120 m³ each, and 4 silos with a capacity of 90 m³ each.

Completed

Fabrication and installation of bulk silos with a capacity of 5 silos, each with a capacity of 60 m³, and 6 silos, each with a capacity of 100 m³.

Completed

Fabrication and installation of 6 round silos, each with a capacity of 100 m³, and 7 square silos, each with a capacity of 150 m³.

Completed

Fabrication and installation of 5 raw material silos, each with a capacity of 300 m³, and 5 bulk silos, each with a capacity of 80 m³.

Completed

Industrial facility for the production of construction chemicals with a capacity of 60,000–80,000 tonnes per year.

Completed

Industrial facility for the production of construction chemicals with a capacity of 100,000–150,000 tonnes per year.

Completed

Industrial facility for the production of mineral fertilizers with a total capacity of over 465,000 tonnes per year.

Completed

Industrial facility for the production of mineral fertilizers with a capacity of 300,000 tonnes per year.

Completed

The facility has a production capacity of 100,000 tonnes of mineral fertilizers per year.

Completed

The wood pellet production facility is designed with a planned production capacity of approximately 85,000 tonnes of wood pellets per year.

Completed

The wood pellet production facility is designed for efficient production of high-quality pellets, with a production line capacity of 5 tonnes per hour.

Completed

The wood pellet production facility is designed for efficient production of high-quality wood pellets, with a production line capacity of 10–12 tonnes per hour.

Completed

The wood pellet production facility is designed with a planned production capacity of 48,000 tonnes of wood pellets per year.

Completed

The wood pellet production facility is designed with a planned production capacity of 23,000 tonnes of wood pellets per year.

Completed

Design of steel structures, including structural calculations. Fabrication, supply, and installation of a complete pet food production facility. A total of 150,000 kg of steel structures was supplied and installed.

Completed

Design of steel structures, including structural calculations. Fabrication, supply, and installation of a complete feed production facility. A total of 100,000 kg of steel structures was supplied and installed.

Completed

Design of steel structures, including structural calculations. Fabrication, supply, and installation of a complete pet food production facility. A total of 600,000 kg of steel structures was supplied and installed.

Completed

Design of steel structures, including structural calculations. Fabrication, supply, and installation of a complete pet food production facility. A total of 400,000 kg of steel structures was supplied and installed.

Completed

Design of steel structures, including structural calculations. Fabrication, supply, and installation of a complete feed production facility. A total of 200,000 kg of steel structures was supplied and installed.

Completed

Design of steel structures, including structural calculations. Fabrication, supply, and installation of a complete feed production facility. A total of 450,000 kg of steel structures was supplied and installed.

Completed

Design of steel structures, including structural calculations. Fabrication, supply, and installation of a complete processing facility for sunflower, soybean, and rapeseed processing. A total of 250,000 kg of steel structures was supplied and installed.

Completed

Design of steel structures, including structural calculations. Fabrication, supply, and installation of a complete production facility for agrochemicals and agricultural protection products. A total of 140,000 kg of steel structures was supplied and installed.

Completed

Engineering, supply and installation of mechanical-technological equipment for the GR, WP1 and WP2 production lines, designed and executed in accordance with modern industrial standards and the requirements of the chemical industry.